6 Industry Drive
Waterford, NY 12188

Union College Science & Engineering Building Expansion and Renovtions

Project Description

SCOPE:

Concrete package for the 140,000 SF Union College Science & Engineering Building (subcontractor to Turner Construction.) Included construction of 13′ concrete foundations, elevated posted slabs, slabs on deck. Shoring and decking for posted slab, concrete trench infills, column enclosures, temporary protection and steel vibration columns. 

ARCHITECT:

Einhorn Yaffee Prescott

VALUE:

$100 million total project  – the largest and most comprehensive project to date on the Union College Campus. 

INDUSTRY:

Education

Project Details

DATE:

2018

DURATION:

18 months

Have a project? Contact Us Today.

Have a project? Contact Us Today.

Scroll to Top