
Central Park Pool
Project Description
SCOPE:
22,000 cubic yards of concrete range with mix designs from 3,000 psi up to 10,000 psi. Multiple basemat slabs with up to 6’ thick and 2,500 cubic yards each. 10 concrete cast in place elevator/stairwell shafts up to 200 vertical feet.
ARCHITECT:
Saratoga Associates
VALUE:
$9.1M
INDUSTRY:
Aquatics
Project Details
DATE:
July 2024
DURATION:
1.5 Years


