6 Industry Drive
Waterford, NY 12188

Projects

Schenectady County Public Works Garage Building and Sign Shop

Schenectady County Public Works Garage Building and Sign Shop Project Project Description SCOPE: The Schenectady County Public Works Garage Building and Sign Shop Project is a comprehensive capital improvement initiative designed to modernize and enhance the County’s operational infrastructure. Located at the Public Works facility on Kellar Avenue, the project involved site preparation, ground improvements, […]

Schenectady County Public Works Garage Building and Sign Shop Read More »

Clapper Road WTP

Clapper Road WTP Project Description SCOPE: Jersen Construction served as General Contractor for critical upgrades to the Clapper Road Water Treatment Plant for the Town of Bethlehem. The project modernized key treatment processes and infrastructure to enhance reliability, efficiency, and water quality for the community. The work included the decommissioning and rehabilitation of existing waste

Clapper Road WTP Read More »

Irving Consumer Products – Buffer Building

Irving Consumer Products – Buffer Building Project Description SCOPE: Jersen Construction served as General Contractor for the construction of a 66,200-square-foot buffer building at the Irving Consumer Products facility in Fort Edward, New York. The project represents the first phase of a broader site expansion aimed at improving operational efficiency and supporting future growth. The

Irving Consumer Products – Buffer Building Read More »

Great Sacandaga Lake Fire District

Great Sacandaga Lake Fire District Project Description SCOPE: New construction of a 12,500 SF firehouse on a 0.80-acre vacant parcel in downtown Northville, NY. The facility features four apparatus bays totaling 6,000 SF, with a 2,200 SF mezzanine designed for elevated training exercises. A 4,000 SF administrative wing provides support spaces including a kitchen, training

Great Sacandaga Lake Fire District Read More »

Saratoga Spa State Park Peerless Pool Complex

Saratoga Spa State Park Peerless Pool Complex Project Description SCOPE: Peerless Pool, nestled within Saratoga Spa State Park since 1962, is undergoing a transformative $3.6 million renovation aimed at revamping its beloved Kiddie and Slide pool zone into a vibrant, family friendly children’s play area. The Office of Parks, Recreation and Historic Preservation is spearheading the

Saratoga Spa State Park Peerless Pool Complex Read More »

Mechanicville Park Sprayground

Mechanicville Park Sprayground Project Description SCOPE: Jersen served as the General Contractor for the construction of the new Mechanicville Park Sprayground in Mechanicville, NY. The project includes the demolition and removal of the existing pool within the park, making way for the installation of a modern sprayground featuring unique and interactive water features and play

Mechanicville Park Sprayground Read More »

Knickerbacker Aquatic Center

Knickerbacker Aquatic Center Project Description SCOPE: Jersen is serving as the General Contractor for the construction of the Knickerbacker Aquatic Center in Troy, NY. The project began with the demolition of existing parking lots to make way for a full redevelopment of the site. Work includes installation of a new water main and all associated

Knickerbacker Aquatic Center Read More »

Siena University – Nobel Hall

Siena University – Nobel Hall Project Description SCOPE: Jersen served as the General Contractor for the construction of Nobel Hall, a 45,700-square-foot science building on the Siena University campus. The project scope included the full exterior building envelope, featuring structural metal framing, spray foam insulation, and fireproofing. Exterior finishes were comprised of brick masonry, precast

Siena University – Nobel Hall Read More »

Lincoln Park Pool

https://www.jersen.com/wp-content/uploads/Jersen-Lincoln-Park-Pool-Drone-log-FIN-2.mp4 Lincoln Park Pool Project Description SCOPE: Jersen served as the General Contractor for the construction of the new Lincoln Park Pool complex in Albany, NY. The 72,000-square-foot aquatic facility replaces the original 1931-era pool. To ensure structural stability, 285 micro piles—ranging from 40 to 90 feet deep—were installed to bedrock across the site. A

Lincoln Park Pool Read More »

Central Park Pool

Central Park Pool Project Description SCOPE: 22,000 cubic yards of concrete range with mix designs from 3,000 psi up to 10,000 psi. Multiple basemat slabs with up to 6’ thick and 2,500 cubic yards each. 10 concrete cast in place elevator/stairwell shafts up to 200 vertical feet. ARCHITECT: Saratoga Associates VALUE: $9.1M INDUSTRY: Aquatics Project

Central Park Pool Read More »

Scroll to Top