Button Rd Water Tank
Project Description
SCOPE:
Jersen performed the associated appurtenances accompanying the construction of a new 1,000,000-gallon elevated water storage including miscellaneous site work, grading, concrete foundation, foundation piles, piping, altitude valve vault, fencing, paved access road and parking area, and erosion and sediment control measures. Open-cut installation of approximately 670 linear feet of 10-inch high density polyethylene water main to connect the water storage tank to the existing water distribution system, including all associated piping, fittings, hydrants, valves, and the hydrostatic testing and disinfection of the water main.
ARCHITECT:
Sage Engineering/ MJ Engineering
VALUE:
1.1M
INDUSTRY:
Infrastructure
Project Details
DATE:
Oct 2023
DURATION:
1 Year